Stages: rename titles, fix execution order, remove all numbered references

This commit is contained in:
Hermes
2026-06-04 20:04:34 +00:00
parent 5ac701e8ec
commit 8b1b481828
22 changed files with 96 additions and 96 deletions

View File

@@ -498,7 +498,7 @@ but connected through resource flows:
- **Institutional → Social:** Compliance revenue would accelerate the
social protocol's development timeline, but the architecture is
self-developing after Stage 2 — the bootstrap loop means engineering
self-developing after the Neurosymbolic Agent stage — the bootstrap loop means engineering
does not depend on external funding. Revenue is amplificatory, not
necessary.
- **Social → Institutional (late stage):** At Phase 3+, the social
@@ -515,7 +515,7 @@ directions. Institutional success can exist without social success
without institutional success — the social protocol reaches critical
mass through pure platform competition, and its development is not
blocked by lack of institutional revenue because the architecture is
self-developing after Stage 2 (the agent writes its own code; the
self-developing after the Neurosymbolic Agent stage (the agent writes its own code; the
bootstrap loop makes engineering self-sustaining). The coupling is
amplificatory, not foundational: each side's success makes the other
more valuable, but neither depends on the other to survive.