- Merge stage-0-now.org content into stages/_index.org (now titled 'Stage 0: Now')
- Delete stage-0-now.org
- Add stage overview table to the top of the page (8 stages, what changes, threat eliminated)
- Update all cross-references from old stage-0 UUID to stages _index UUID
- Regenerate ID map to reflect the deletion
- Also fix page-list shortcode: .ByTitle -> .ByWeight so subpage listing matches sidebar order
- Rebuild: 147 files, 0 errors
- Add :WEIGHT: extraction to build script (from Org PROPERTIES into Hugo TOML frontmatter)
- Shorten architecture _index.org staged progression to a single-line summary pointing to stages/ directory
- Weight order (sidebar now reads in this order):
stages/ (10-20) — the roadmap, early so references make sense
lisp-foundation.org (21) — why Lisp
knowledge-layers/ (30-32) — how the system knows
design-decisions through neuro-comparison (40-45) — design
systemic-effects (50) — implications
org-knowledge-base through repo-organization (60-64) — reference
- Rebuild: 148 files, 0 errors
- architecture.org becomes a narrative: problem → three-subsystem solution
→ staged approach → what it means
- Moved TAM, revenue paths, analytical frames, strategy/IP links to _index.org
- _index.org is now the navigation hub with roadmap table and all catalog links
Combined all three under verification-monopoly.org with title:
'The Evaluation Harness — Collective Regression Suite as Certification Monopoly'
Structure: (1) vision from monopoly, (2) service from harness, (3) spec from collective-regression.
All three IDs preserved in PROPERTIES.
Deleted evaluation-harness.org and collective-regression-suite.org.
- Moved everything from ideas/passepartout/ to projects/passepartout/
- Moved legal structures to projects/flags/
- Created missing _index.org files for all subdirectories
- Stripped redundant passepartout- prefix from filenames
- Rewrote root _index.org as generalized brain index (projects + concepts)
- Updated Hugo nav to Projects/Concepts
- Updated build script section descriptions
- Deleted stale ideas/passepartout-economics.md orphan
- Split competitive-analysis-2026-05.org → TOC + 9 competitor files in
ideas/competitors/. Dropped date from filename. All competitor UUIDs
generated, TOC keeps original UUID for backlink continuity.
- Deleted passepartout-economics.org archive (replaced by 27-node KB).
- Inlined 5 'See also' blocks into natural prose (compliance-index,
first-mover-window, revenue-table, orders-of-magnitude-time,
native-org-knowledge-base).
- Linked 7 orphan compliance pages back to compliance index + finished
truncated sentences.
- Linked all 14 Agora requirement docs from topic-relevant pages
(identity→lisp-machine-security, infrastructure→compute-marketplace,
social-space→growth-strategy, exchange→agora-contracts, etc.).
- Linked ai-industry-impact from investment-thesis, sufficiency-flip,
verification-appliance, effects-growth-flywheel (up from 1 to 10+ pages).
- Fixed CREATED timestamps to use git commit dates instead of today.
- Made all links absolute from root (no port inheritance).
- Removed stale agora/docs/ duplicate content.