memex: update passepartout submodule → v0.7.2, add notes

passepartout v0.7.2 (Gate Trace + HITL + Search + 11 more features):
- Gate trace visualization with Ctrl+G toggle
- HITL inline panels with styled collapse on approve/deny
- Agent identity file + /identity command
- Safe-tool read-only allowlist
- Message search mode with Up/Down nav and highlights
- Context budget visibility with section breakdown
- Session rewind /sessions /resume /rewind
- Undo/redo per operation
- Context debugging /context why /context dropped
- Tool hardening (timeouts, write verify, read-only cache)
- Tag stack severity tiers + trigger counts
- Merkle provenance audit + audit-verify
- Self-help /help <topic> reads USER_MANUAL.org
- Live CONFIG section in system prompts
- Pads: Page Up/Down scroll by 10 lines

Core 92/92  TUI Main 104/104  TUI View 29/29  Neuro 13/13
This commit is contained in:
2026-05-08 21:56:11 -04:00
parent 8c64b18335
commit 4e9431ec1d
254 changed files with 55970 additions and 3 deletions

View File

@@ -0,0 +1,75 @@
#+TITLE: Captured from memory/2026-03-17.md on 2026-03-23 01:00
#+FILETAGS: :atomic:note:
* Captured from memory/2026-03-17.md on 2026-03-23 01:00
:PROPERTIES:
:CREATED: ef346e4e-a7d6-4b78-be8a-3eaeba83fea8
:SOURCE: /home/user/memex/daily/2026-03-17.org
:END:
:CREATED: [2026-03-23 Mon 01:00]
## Major System Developments
### Three OpenClaw Skills Deployed
Created and deployed three integrated skills for the opencortex-memex system:
- *opencortex-memex-zettlekasten*: Nightly distillation of daily logs into atomic notes
- *opencortex-memex-gtd*: Automated task promotion and GTD workflow management
- *opencortex-memex-workbreakdown*: Meta-cognitive skill for task decomposition to prevent context saturation
All skills follow the established pattern: SKILL.md with YAML frontmatter, README.md for users, and integration with the PARA + Atomic Notes (Zettelkasten) + GTD workflow.
### Agora Gap Verification Progress
Completed comprehensive gap verification:
- *CRITICAL gaps (4)*: 2 IMPLEMENTED, 2 REAL gaps confirmed
- *HIGH gaps (15)*: 7 IMPLEMENTED, 3 PARTIAL, 5 REAL
- *MEDIUM gaps (14)*: 10 verified, 4 deferred pending pressure-testing session
Used sub-agents for parallel verification of HIGH gaps successfully. Sub-agents struggled with MEDIUM gaps due to unclear task boundaries.
### 21-Layer System Audit
Conducted first comprehensive self-assessment across 21 system layers. Honest grading:
- *Overall: C+ (70%)*
- *Strengths*: Git rollback (A-), PARA filing structure (B+), Skills framework (B-)
- *Critical gaps*: Simulation/sandbox (F), Health/heartbeat automation (D+), Coordination layer (C)
Identified 5 highest-confidence solutions and 4 highest-risk gaps. Awaiting pressure-testing session before building.
### Tool Failure Protocol Established
After repeated tool syntax errors and gateway restart misuse, formalized the protocol:
1. READ error message completely
2. IDENTIFY specific issue
3. FIX actual syntax problem
4. RETRY with corrected parameters
5. ESCALATE only specific error after 2 attempts
Documented in tool_failure_protocol.org (Atomic Notes (Zettelkasten) atomic note, concept-based filename).
### Key Operational Learnings
- Gateway restarts are for actual service issues, not syntax errors
- Skills don't automatically replace old habits; must actively consult them
- Complexity check must be invoked BEFORE execution, not as justification after
- "What should I do?" is forbidden; use complexity check to decide autonomously
- Sub-agents successful for parallel HIGH gap verification; MEDIUM gaps need clearer task definition
### Token Usage Reality Check
685k tokens "in" vs 6.4k "out" (107:1 ratio) revealed unsustainable consumption pattern. Added research task to Infrastructure project for optimization strategies.
### Workflow Integration Success
Successfully established:
- Bidirectional linking between GTD.org and 5_projects/*
- Atomic Atomic Notes (Zettelkasten) notes in memex/2_notes/
- Clean separation: actionable tasks in GTD, reference material in projects
- LOGBOOK drawers for state tracking
- .env-based configuration for portability
### Pattern Recognition Failure
Despite creating skills explicitly forbidding dated filenames in notes, I created "operational_learnings_2026-03-17.org" before correcting to "tool_failure_protocol.org". Skills don't automatically override habits; active consultation required.
## Status: Session End
Awaiting pressure-testing session for 21-layer audit assumptions. All building paused until final plan approved.
* Backlinks
- Source: [[file:/home/user/memex/daily/2026-03-17.org][2026-03-17.org]]