v0.36.0: Phase 7 — 10-80-10 Planner #11

Open
opened 2026-05-13 11:12:34 -04:00 by amr · 0 comments
Owner

Planning engine built on matured symbolic index. Screamer + ACL2 for plan verification.

Planning engine built on matured symbolic index. Screamer + ACL2 for plan verification.
amr added this to the v1.0.0 — Neurosymbolic Maturity milestone 2026-05-13 11:12:34 -04:00
amr added the project/logos label 2026-05-13 11:12:34 -04:00
Sign in to join this conversation.