Files
hermes-brain/ideas/orders-of-magnitude-time.org
Hermes cc3976fb7f ideas: editorial sweep — atomization, interlinking, restructuring
- Split competitive-analysis-2026-05.org → TOC + 9 competitor files in
  ideas/competitors/. Dropped date from filename. All competitor UUIDs
  generated, TOC keeps original UUID for backlink continuity.
- Deleted passepartout-economics.org archive (replaced by 27-node KB).
- Inlined 5 'See also' blocks into natural prose (compliance-index,
  first-mover-window, revenue-table, orders-of-magnitude-time,
  native-org-knowledge-base).
- Linked 7 orphan compliance pages back to compliance index + finished
  truncated sentences.
- Linked all 14 Agora requirement docs from topic-relevant pages
  (identity→lisp-machine-security, infrastructure→compute-marketplace,
  social-space→growth-strategy, exchange→agora-contracts, etc.).
- Linked ai-industry-impact from investment-thesis, sufficiency-flip,
  verification-appliance, effects-growth-flywheel (up from 1 to 10+ pages).
- Fixed CREATED timestamps to use git commit dates instead of today.
- Made all links absolute from root (no port inheritance).
- Removed stale agora/docs/ duplicate content.
2026-05-24 16:25:55 +00:00

31 lines
1.8 KiB
Org Mode

#+title: Orders of Magnitude — Time
#+filetags: :passepartout:framework:time:scale:hierarchy:
:PROPERTIES:
:ID: 2cdca4b0-6b41-44b4-acb0-af21d0e27b00
:ID: orders-of-magnitude-time
:CREATED: [2026-05-23 Sat]
:END:
Time at human scales is best thought of in orders of magnitude, not linear progression. Each jump in scale is qualitatively different — the constraints, the tools, the feedback loops, and the failure modes change entirely.
The hierarchy:
| Scale | What fits | Feedback | Failure mode |
|-------|-----------|----------|--------------|
| Minutes | Firefighting, ops, real-time decisions | Instant | Burnout, whiplash |
| Hours | Work session, meeting, focused task | Same day | Interruption cascade |
| Days | Shippable thing, momentum building | Next day | Drift, distraction |
| Weeks | Sprint, feature, market pulse | One cycle | Wrong direction |
| Months | Product cycle, hiring, traction | One data point | Bleeding out slow |
| Years | Company, [[id:aa6d062e-a520-5d14-8773-00687ed9c689][moats]], technology shifts | Scarce | Irrelevance |
| Generations | Culture, regulation, infrastructure | Post-founding | Irreversibility |
Practical use:
When planning anything, identify which order of magnitude you're operating in — then use the tools and cadence appropriate to that scale, not the one below or above it. A minutes problem solved with a weeks solution is overengineering; a years problem approached with days thinking is naive.
Common mistake: treating a months/years problem as if it can be solved in days/weeks (startup hype, premature optimization) or a minutes problem as if it deserves weeks of deliberation (analysis paralysis, bikeshedding).
The [[id:dc2e4f22-1c4c-5d4a-a151-f96e5d3b0d70][Time estimates]] page applies this framework to [[id:28c46769-c14b-42aa-ac7a-69d310157f8f][Passepartout]]'s development timeline.