- Rename 'three-pronged' folder to 'knowledge-layers' — prong metaphor
was misleading (implied parallel tines), replaced with epistemic layers
(deductive base, empirical middle, probabilistic oracle — vertical stack)
- Collapse 11 overlapping files into 3 coherent documents:
- knowledge-layers/_index.org: core framework (two engines + one store,
World Model formula, 0-14 layer table, provenance store design,
conflict resolution, cold-start, stage mapping)
- knowledge-layers/practical-implications.org: design-world-aware-of-
physics, 10 powers, Schafmeister existence proof, epistemic transparency
- knowledge-layers/neurological-empirical.org: neural networks in
provenance framework (kept intact)
- Relocate wolfram/mathematica and Schafmeister docs to ideas/viability/
- Integrate into main architecture _index.org:
- Gate: expanded from two vectors (ACL2+LLM) to three (deductive,
provenance/empirical, LLM oracle)
- Autodidactic loop: split into Track 1 (deductive hardening, fast)
and Track 2 (empirical validation, slow, experimental-feedback-driven)
- See also: added Knowledge Layers cross-reference
- Add all-lisp geometry engine note (ideas/lisp-geometry-engine.org) as
concrete illustration of the empirical layer's effect on design work
- Rebuild site: 148 files, 0 errors
39 lines
1.2 KiB
Org Mode
39 lines
1.2 KiB
Org Mode
:PROPERTIES:
|
|
:CREATED: [2026-06-01 Mon]
|
|
:ID: e5f6a7b8-9c0d-1e2f-3a4b-5c6d7e8f90ab
|
|
:END:
|
|
#+title: Passepartout Server
|
|
#+filetags: :passepartout:hardware:homelab:build:
|
|
|
|
**Passepartout Server — Build BOM & Phased Plan**
|
|
|
|
- Chassis: CX4712 ($439 Sliger)
|
|
- CPU: EPYC 7002 Rome SP3 (~$100-200 used)
|
|
- Board: Supermicro H11SSL-i (~$150 used)
|
|
- Cooler: Asetek 836SA-M1 AIO ($250 Sliger add-on)
|
|
- GPUs: 2x used RTX 3090 (~$750 ea)
|
|
- RAM: 256GB via 8x 32GB Crucial DDR4-3200 ECC ($210/ea)
|
|
- PSU: Corsair RM1000e 1000W ($148)
|
|
- Fans: 3x Noctua NF-A12x25 PWM ($75 Sliger)
|
|
- Rails: Sliger 20" rack slides ($109)
|
|
- HBA: LSI 9300-8i IT mode ($75)
|
|
- Boot NVMe: 1TB (~$60)
|
|
- ZFS special vdev: 2x 512GB NVMe mirrored (~$50/ea)
|
|
- HDDs: 6x 20-24TB recertified (~$250-350/ea)
|
|
|
|
Total estimate: ~$5,900
|
|
|
|
**Phased buying plan (~$1K per phase)**
|
|
|
|
1. EPYC CPU + SP3 motherboard (~$250) — test boot
|
|
2. CX4712 + PSU + fans + AIO + rails + NVMe boot + HBA (~$1,156)
|
|
3. 128GB RAM (4x32GB Crucial) + 1st RTX 3090 (~$1,590)
|
|
4. 4x 20-22TB HDDs recertified (~$1,200)
|
|
5. 128GB more RAM + 2nd RTX 3090 + 2x 512GB NVMe (~$1,690)
|
|
|
|
**Stages**
|
|
|
|
- Now: All-in-one (compute + storage + inference)
|
|
- Future: Proxmox secondary node when 3 better nodes appear
|
|
- Final: Backup server (just HDDs + ZFS)
|